Click on image to view enlargement.
Figure 8-2. Schematic sections from seismic showing structural configuration of basement oil-producing wells. Production of the three wells completed in the basement showed a progressive increase on the water cut. Later, well C313 showed a rapid production decline of the production due to an obstruction in the borehole.